SN | Project | Client | Status |
1 | Implementation of Environmental and Social Management Plan (ESMP), Resettlement Action Plan (RAP) and Line Route Survey for Lagos/Ogun Power Transmission Projects. | Transmission Company of Nigeria (TCN). JV with EEMS LTD | Starting, 2020 |
2. | Environmental Impact Assessment of Bayelsa State Free Trade zone | Bayelsa State Government | On-going |
3. | Resettlement Action Plan (RAP) for Proposed Reconstruction of Alaoji – Onitsha 330kV DC Quad Core Power Transmission Line Project | Transmission Company of Nigeria (TCN). (For Geomatics Nig. Ltd) | Completed, 90% |
4. | Resettlement Action Plan (RAP) for Proposed Reconstruction of Ugheli (Delta) – Benin 330kV DC Quad Core Power Transmission Line Project | Transmission Company of Nigeria (TCN). (For Geomatics Nig. Ltd) | Completed, 90% |
5. | Resettlement Action Plan (RAP) for Proposed Reconstruction of Kaduna Mando – Kano Rimin Zakara 330kV DC Power Transmission Line and Associated Substation Project. | Transmission Company of Nigeria (TCN). (For Geomatics Nig. Ltd) | Completed, 90% |
6. | Environmental Impact Assessment of the flyover projects at Rumuogba (Artillery), Rebisi (Garrison) and Rumuokoro junctions in Port Harcourt City | Resourcefield Limited for Julius Berger Nigeria PLC / RVSG | Completed, 90% |
7. | Environmental Impact Assessment of the proposed Helipad Project within the Akwa Ibom Stadium Complex, Uyo. | Akwa Ibom State Government (AKSG). | Completed, 80% |
8. | Implementation of Resettlement Action Plan (RAP) for the Reinforcement of High Voltage Transmission Ring (Abuja Feeding Scheme Transmission) Project in The FCT and Nasarawa State. | Transmission Company of Nigeria (TCN). | Completed, 2019 |
9. | Environmental and Social Impact Assessment (ESIA) of the proposed Ikweonna Modular Refinery and Petrochemical Project in Onna, Akwa Ibom State | Ikweonna Refinery Limited, Uyo | Completed, 2019 |
10. | Environmental Impact Assessment of the proposed 500MW CCGFPP power project at Tigbori, Ijebu East LGA, Ogun State. | Tigbori Power Limited | Completed, 2017 |
11. | Environmental Impact Assessment of the proposed Medical City, Afaha Obong, Abak, Akwa Ibom State. | Thompson & Grace Investment, Port Harcourt | Completed, 2016 |
12. | Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP) of the proposed 505MW CCGFPP power project with 15km gas pipeline and 18km PTL in Akwa Ibom State. | Thompson & Grace Investment, Lagos | Completed, 2016 |
13. | Environmental Auditing of the Julius Berger Mainyard, Port Harcourt | Resourcefield Limited for Julius Berger Nigeria PLC | Completed, 2016 |
14. | Environmental and Social Impact Assessment (ESIA); Line Route Survey of the proposed 100MW Photovoltaic Power project at Ijero, Ekiti State. | Technixx Power Limited | Completed, 2016 |
15. | Environmental and Social Impact Assessment (ESIA); Line Route Survey of the proposed 2×40/60MVA Substation at Ikorodu Industrial Layout. | Megasteel Company Nigeria Limited, Lagos | Completed, 2016 |
16. | Environmental Impact Assessment of the proposed 20th Anniversary Hospital and Helipad Project in Uyo. | Akwa Ibom State Government (AKSG). | Completed, 2015 |
17. | Environmental Impact Assessment of the proposed 90km Oferekpe – Ugwuaji PTL | Ebonyi Independent Power Plant Ltd | Completed, 2015 |
18. | Geotechnical Investigation of the proposed 90km Oferekpe – Ugwuaji PTL | Exalted Infrastructures Ltd for of the proposed 90km Oferekpe – Ugwuaji PTL | Completed, 2015 |
19. | Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP); Line Route Survey and Geotechnical investigation of the proposed 100MW Photovoltaic Power project at Gwagwalada, Federal Capital Territory. | LR-Aaron Power Limited | Completed, 2015 |
20. | Environmental Impact Assessment of the proposed 2900MW Gas-fired Power Plant project at Akahafu/Oferekpe, Ebonyi State | Ebonyi Independent Power Plant Ltd | Completed, 2015 |
21. | Environmental Impact Assessment of the proposed Coal Mining Project in Ankpa, Kogi State. | Western Metal Product Company Limited (WEMPCO). | Completed, 2015 |
22. . | Environmental Impact Assessment of the proposed 70km Eket- Uyo – Itu Power Transmission Line | NDPHC | Completed, 2015 |
23. | Environmental Impact Assessment of the proposed 130km Gurara – Mando PTL. | Salini Nig Ltd for FMWR, Abuja | Completed, 2011 |
24. | Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP) of the proposed 1200MW power station and ancillary facilities in Itobe, Kogi State. | Zuma Energy Nig Ltd | Completed, 2011 |
25. | Environmental and Social Impact Assessment (ESIA) of the proposed Amakpe Refinery and in Esit Eket, Akwa Ibom State | Akwa Ibom State Government | Completed, 2006 |
26. | Environmental and Social Impact Assessment (ESIA) of the proposed Resource Refinery Project in Ibeno, Akwa Ibom State | Akwa Ibom State Government | Completed, 2003 |
27. | Environmental Impact Assessment of the Maigatari Export Processing, Maigatari, Jigawa State | Jigawa State Government | Completed, 2002 |
28. | Environmental Baseline Studies of the proposed Owopele North-A Oil field Location, Ugheli | Nigeria Petroleum Development Company Limited (as Pamady Ventures) | Completed, 1996 |
29. | Environmental Auditing of the OML 96 Oil facilities, Ologbo, Edo State | Nigeria Petroleum Development Company Limited (as Pamady Ventures) | Completed, 1996 |
30. | Environmental Auditing of the Oredo Flow Station and LACT Units | Nigeria Petroleum Development Company Limited (with Pach-Malek Associates) | Completed, 1996 |
31. | Environmental Auditing of oilwell locations Delta State | Nigeria Petroleum Development Company Limited (with Benmau Ent.) | Completed, 1996 |
32. | Environmental Auditing of oilwell locations Delta State | Nigeria Petroleum Development Company Limited (with Envi- Aquaterra) | Completed, 1996 |
33. | Environmental Impact Assessment of the proposed Cross River Industrial Park (Free Zone), Calabar. | Government of Cross River State | Completed, 70% |
34. | Environmental and Social Impact Assessment (ESIA), Environmental and Social Management Plan (ESMP), Resettlement Action Plan (RAP) and Line Route Survey for Lagos/Ogun Power Transmission Projects | Transmission Company of Nigeria (TCN); funded by Japan International Cooperation Agency (JICA) JV with EEMS LTD | Completed 2019 |
35. | Environmental Auditing of the Pleasure Park, Port Harcourt. | Resourcefield Limited for Julius Berger Nigeria PLC | Completed 2018 |
36. | Environmental Auditing of Designated Road Projects in Port Harcourt. | Resourcefield Limited for Julius Berger Nigeria PLC | Completed 2018 |
37. | Environmental and Social Impact Assessment (ESIA), Environmental and Social Management Plan (ESMP), Resettlement Action Plan (RAP) And Line Route Survey for Reinforcement of the High Voltage Transmission Ring (Abuja Feeding Scheme Transmission) Project in The FCT and Nasarawa State | Transmission Company of Nigeria (TCN); funded by Agence Francaise De Developpement (AFD).
| Completed 2017 |
38. | Environmental Impact Assessment of the proposed Calabar – Ikom – Katsina Ala Superhighway in Cross River State. | Government of Cross River State | Completed 2016 |
39. | Environmental Impact Assessment of NASCO Town Free Trade Zone | NASCO Group | Completed 2016 |
40. | Environmental Impact Assessment of the proposed 252km Nkalagu- Abakiliki – Ikom – Obudu | Primebase Limited (for NDPHC) | Completed 2015 |
41. | Environmental and Social Impact Assessment of the proposed 7km power transmission line in Egbema, Imo State. | Zuma Energy Nigeria Limited | Completed 2015 |
42. | Environmental Impact Assessment of the proposed Gold Exploration and Mining Project in Anka, Zamfara State. | Abasa Nigeria Enterprises Limited. | Completed 2014 |
43. | Environmental and Social Impact Assessment of the proposed 400MW Gas-fired Power Plant at Egbema, Imo State. | Zuma Energy Nigeria Limited | Completed 2013 |
44. | Environmental Impact Assessment of the proposed Itobe – Ajaokuta Power Transmission Line Project in Kogi State. | TCN/ZENL | Completed 2013 |
45. | Environmental Impact Assessment of the proposed Gold Exploration and Mining Project in Taki,Kaba Bunu LGA, Kogi State. | Abasa Nigeria Enterprises Limited. | Completed 2013 |
46. | Environmental Impact Assessment of the proposed Gold mining in Taki, Kabba Bunu LGA, Kogi State. | Abasa Ent, Nig Ltd, Abuja | Completed 2013 |
47. | Environmental Auditing of the Julius Berger Mainyard, Uyo. | Resourcefield Limited for Julius Berger Nigeria PLC | Completed 2013 |
48. | Environmental and Social Impact Assessment Scoping Study of the proposed Akwa Ibom Deep Sea Port. | Akwa Ibom State Government | Completed 2013 |
49. | Environmental Impact Assessment of the proposed Aka – Nung Udoe Road in Akwa Ibom State. | Akwa Ibom State Government | Completed 2013 |
50. | Environmental Impact Assessment of the proposed Abak – Ikot Oku Ikono Road in Akwa Ibom State. | Exalted Infrastructures Limited, for Akwa Ibom State Government | Completed 2013 |
51. | Environmental Impact Mitigation Monitoring of the Akwa Ibom Stadium Complex, Uyo. | Akwa Ibom State Government (AKSG). | Completed 2012 – 2015 |
52. | Environmental Impact Assessment of the proposed 100MW Power Station at Apapa. | Golden Penny Power Limited (for Supertek Nig Limited) | Completed 2012 |
53. | Environmental Impact Assessment of the proposed 90MW Power Station at Magboro, Ogun State. | Bresson AS Limited (for Supertek Nig Limited) | Completed 2012 |
54. | Environmental Impact Assessment of the proposed 500MW power station at Ajaokuta, Kogi State. | Supertek Nig Ltd | Completed 2012 |
55. | Environmental Impact Assessment of the proposed coal mining in Ankpa, Kogi State. | Zuma 828 Coal Ltd | Completed 2012 |
56. | Environmental Impact Assessment of the proposed Oil Terminal Base, Tarkwa Bay, Lagos. | Sahara Energy Nig Ltd | Completed 2012 |
57. | Environmental Impact Assessment of the proposed Ring Road III Project, Uyo in Akwa Ibom State. | Akwa Ibom State Government | Completed 2012 |
58. | Environmental Impact Assessment of the proposed Gold mining in Taki, Kogi State. | Rotex Capital Ltd, Abuja. | Completed 2011 |
59. | Environmental Impact Assessment of the proposed quarrying and marble production in Ekirin-Adde, Ijumu LGA, Kogi State. | Abasa Ent. Nig. Ltd | Completed 2011 |
60. | Environmental Impact Assessment of the proposed FPSO Fabrication Yard at Tarkwa Bay, Lagos. | Baklang Nig Ltd | Completed 2011 |
61. | Environmental Impact Assessment of the proposed 230mw Omoku Gas Power Station. | NDPHC | Completed 2010 |
62. | Environmental Impact Assessment of the proposed coal exploration in Kogi State. | Zuma 828 Coal Ltd | Completed 2010 |
63. | Impact Mitigation Monitoring of the Ibom Tropicana Entertainment Centre, Uyo | Akwa Ibom State Government | Completed 2009-2012 |
64. | Impact Mitigation Monitoring of the Ibom Industrial City Project. | Akwa Ibom State Government | Completed 2009-2012 |
65. | Completion of the Environmental Impact Assessment of the proposed 585MW Ibom Independent Power Station at Ikot Abasi, Akwa Ibom State. | Government of Akwa Ibom State | Completed 2009 |
66. | Completion of the Environmental Impact Assessment of the proposed 46km Ikot Abasi – Eket Power Transmission Line. | Government of Akwa Ibom State | Completed 2009 |
67. | Environmental Impact Assessment of Ibom Industrial City | Akwa Ibom State Government | Completed 2009 |
68. | Impact Mitigation Monitoring for Akwa Ibom International Airport | Akwa Ibom State Government | Completed 2006 – 2012 |
69. | Environmental Impact Assessment of the Kano Export Processing | Primebase Limited (for NEPZA, Abuja) | Completed 2002 |
70. | Environmental Impact Assessment of the proposed Four-Star Hotel in Ikot Ekpene, Akwa Ibom. | Akwa Ibom State Government (AKSG) | Completed |